LabPadre provides the latest SpaceX updates: June 25
· ValleyCentral (KGBT)

STARBASE, Texas (ValleyCentral) -- Moving on to the week's testing-related activities, on Monday, SpaceX utilized a rolling road closure to relocate the booster cryogenic proofing and puck-shucking stand from the build site to the Massey outpost. That evening, the Pad 2 deluge system was tested, flooding the flame trench. The test was then repeated late
AI summary · Source: ValleyCentral (KGBT) →